« Saltwater Taffy: The Video | Main | Whipped Cream Basics (revisited) »

Summer Fun: Sidewalk Chalk

Branch Divider
Jun
26
...
2012

As a boy, I spent the entire summer outdoors.  My days were filled with baseball, walking to the lake, riding bikes, and kool-aid stands.  Summer meant taking advantage of three months of the longest days of the year.  We packed every single day with fun… right up until the street lights came on which indicated it was time to be home.

Chalk1

Even when I was required to stay close to home, there was plenty of fun to be had.  All that was really necessary was some chalk and a ball for four square.  Of course, some of the kids would draw or make hearts around the name of their latest crush.  The crushes never lasted long, but neither did the chalk.  One quick summer rain would erase any evidence.

savour... sunny days

Sidewalk Chalk

Before you start:

We used a snow cone or ice cream cone holder as our mold.  This creates a point on one end and a very broad tip on the opposite end.

Be sure to plan accordingly.  This requires some drying time.

Pre-mixed tempera paints will not work the same way.  Stick with powder.

Making it yourself means you have more control over the colors.  Pre-made sidewalk chalk is typically lacking black, for example.

Experiment by pouring two colors into the mold at once creating a swirled chalk.

For a cylinder, cut a toilet tissue roll lengthwise, overlap the edges creating a tube that is 1 inch in diameter and reseal seam with some duct tape.  Stand upright on a tray and fill.

The materials we have listed are for one mold.  We only made one color of each.

The materials:

  • 1/2 cup plaster of paris
  • tempera paint powder
  • 3 oz. water
  • mold

The steps:

  1. Mix the plaster of paris and water in a glass or metal bowl.  It will be quite lumpy and require some vigorous stirring.
  2. Add as much tempera paint powder as you like to attain desired color.  Stir again until well combined.
  3. Pour into the mold of your choice and gently tap against a solid surface to remove any unwanted air pockets.
  4. Allow to dry for at least 24 hours before releasing from mold.
  5. After releasing dry for another 24 hours before using.

Chalk2

TrackBack

TrackBack URL for this entry:
http://www.typepad.com/services/trackback/6a0120a8a2f331970b017615d5a095970c

Listed below are links to weblogs that reference Summer Fun: Sidewalk Chalk:

Comments

Feed You can follow this conversation by subscribing to the comment feed for this post.

Verify your Comment

Previewing your Comment

This is only a preview. Your comment has not yet been posted.

Working...
Your comment could not be posted. Error type:
Your comment has been saved. Comments are moderated and will not appear until approved by the author. Post another comment

The letters and numbers you entered did not match the image. Please try again.

As a final step before posting your comment, enter the letters and numbers you see in the image below. This prevents automated programs from posting comments.

Having trouble reading this image? View an alternate.

Working...

Post a comment

Comments are moderated, and will not appear until the author has approved them.